MANUFACTURING IMPROVEMENT MADE EASY BY VORNE

Single-Minute Exchange of Die (SMED)

Reducing changeover times is a great way to get more out of your process without adding new equipment. Learn about how SMED can help from the articles linked below.

SMED Topics

Graph that shows human improvements provide quick wins, while technical improvements have a long tail.

SMED Basics

SMED, also called quick changeover, is the term used to represent the Single Minute Exchange of Die or setup time that can be counted in a single digit of minutes. SMED is often used interchangeably with “quick changeover.”

timer

3 minute read

Strategic

Chart showing that before implementing SMED your changeovers are long, but can be reduced by separating, converting, and streamlining.

Implementing SMED

Changeover times can typically be reduced to less than 10 minutes (i.e., single-digit minutes). Analyze each element of the changeover to see if it can be separated (moved external to the changeover), converted (modified to be external), or streamlined.

timer

7 minute read

Tactical

What's included in your 90-day free trial?
Andon Report
VORNE XL | Works with any machine, any process, right out of the boxEasy, quick self-install | Accurate, real-time KPIs immediatelyTry XL for FREE today
GET STARTED